West End, Ohio

A construction bid required controlling traffic in a single lane closure with 5 driveways intervening within the confines of the work zone. We used two Pop-Up-LD trailers to control the alternating traffic, utilizing microwave detectors to extend the green times based upon traffic volume. We then used 5 Pop-Up JRs to control the driveways, integrating them into the system. We used microwaves to activate the driveway signals.

Technology used:
2 Pop-Up-LD trailers with Microwave detection
5 JRs with microwave detection

About Allison Beach